Drilling Rig Move Services

    Expert Rig Move Logistics in Nigeria

    Rig mobilisation and demobilisation are among the most complex and high-risk logistics operations in the oil and gas industry. A single delayed rig move can cost an operator millions of dollars in downtime and lost production. Naphtali Energy Nigeria Ltd has built a specialist rig move team with the experience, equipment, and operational capability to execute safe, efficient and on-schedule rig moves across Nigeria — whether onshore, swamp, or offshore.

    From planning and permitting through to heavy transport, load-out, marine towing and final rig-up at the new drilling location, we manage every element of the rig move operation with the precision and HSSE discipline that the oil and gas industry demands.

    Rig Move Services We Provide

    Onshore Rig Moves

    Heavy transport and logistics for land rig mobilisation and demobilisation, including permits, road surveys and equipment tracking.

    Swamp & Shallow Water Rig Moves

    Barge, tug and boat mobilisation for rig moves in Nigeria's swamp, creek and shallow water environments.

    Offshore Rig Moves

    Full-scope offshore rig move management including anchor handling, barge positioning and marine coordination.

    Rig Move Planning & Engineering

    Detailed rig move plans, load-out engineering studies and route surveys for safe and efficient operations.

    Equipment & Heavy Lift

    Crane barge and heavy lift coordination for rig components, substructures and drilling equipment.

    HSSE Management

    Comprehensive safety management including risk assessments, toolbox talks and incident-free operations.

    Why Operators Choose Naphtali Energy for Rig Moves

    Extensive experience in Nigeria's challenging operating environments — onshore, swamp, shallow water and offshore.
    Strong relationships with Nigerian regulatory bodies, including DPR (now NUPRC), NIMASA and State Government agencies.
    Dedicated rig move superintendent assigned to every operation for single-point accountability.
    Zero Lost Time Incident (LTI) track record on completed rig move operations in Nigeria.

    How We Execute a Rig Move

    1

    Pre-Move Survey & Planning

    Route survey, load studies, regulatory permit applications and rig move programme development.

    2

    Resource Mobilisation

    Heavy transport equipment, marine vessels, crane barges and personnel mobilised and briefed.

    3

    Rig Disassembly & Load-Out

    Systematic rig disassembly, equipment inspection and controlled load-out onto transport vessels or trailers.

    4

    Transit Operations

    Managed transport to new location with continuous tracking, safety monitoring and communication.

    5

    Rig-Up & Commissioning

    Equipment delivery to new location, rig-up coordination and operational handover to drilling team.